Science and Catering students Hannah, Caitlin, Jasmine and Shannon joined me, along with Laurence Wright and Ashley Mutch from H. Mealing & Sons, on Monday for the official “cutting the ground” ceremony for the new Science and Technology building.

This has been a really exciting week! We found out back in April that we had been awarded £3.9 million as part of the Education and Skills Funding Agency’s Condition Improvement Fund to replace the ageing facilities in Tudor with a brand new building. Since then Mr Branch has been working flat out in collaboration with our architects, Quattro, the legal team, building contractors, the planners and the Science and Technology staff to finalise the plans, schedules and designs for the building. Finally, on Monday, work began with the first diggers starting the excavations.

IMG_0061

I got to sit in a JCB!

A bigger project

We already have experience in developing a new build with the Alan Turing Building, but this is almost twice the size. At almost 14,000 square metres, the new build will contain twelve new Science laboratories and two new catering classrooms, along with the necessary prep rooms and offices for staff. A Science block brings with it all kinds of challenges that “normal” buildings don’t have, including fume cupboards and gas taps, but also facilities for the safe storage of nuclear materials and hazardous chemicals. And we are determined that the catering facilities will be state-of-the-art too, with all-new equipment for our students to cook up a storm with!

IMG_0057

Shannon, Caitlin, Hannah and Jasmine wanted a go too!

A look at the plans

This slideshow requires JavaScript.

One of the highlights of our visit to the site compound on Monday was a chance to look through the plans. From the landscaping that is going to take place around the building, to the plans for the pathway to get access around the Sports Centre, and particularly to the room plans, it was amazing to see the drawings of how the building will look. The contractors have also marked out the footprint of the building on the ground this week – it’s going to be huge.

What’s next?

Later this year we’re going to be running a competition with our students to choose the name for the new Science and Technology block. Students will research famous female scientists, and present to Senior Leaders and Governors their pitches for why they think our building should be named after their chosen individual. The most persuasive presentation will win! We hope that this will provide inspiration for students using the building over the next sixty years to pursue innovation and excellence in STEM (Science, Technology, Engineering and Maths) and overcome the inequality which is currently a big issue in that sector.

The third and final phase of our Tudor block project will be the demolition of the existing building, and the redevelopment of the site where the building has stood for over 60 years. We had the first planning meeting about phase three this week, as we prepare our next bid. By the end of 2019, the whole Academy site will look very different indeed!

3 thoughts on “The new Science and Technology Building

  1. Pingback: Laying the foundations | The Headteacher's Blog

  2. Pingback: Assembly: Value | The Headteacher's Blog

  3. Pingback: Pass me the wrecking ball! | The Headteacher's Blog

Leave a comment